Decks, Pools & Basements

  1. Decks
  2. Pools
  3. Finished Basements

Requirements

  • Two copies of a survey showing where the deck is to be located
  • A zoning permit application (requires a $25 check)
  • A construction folder
  • A building tech section
  • If the property contains a well or septic, approval from the Board of Health
  • Two copies of plans sealed by an Architect or drawing by the homeowner (signed and dated)
  • If any electric work is to be done, an electric tech section
  • If any plumbing work is to be done, a plumbing tech section

For More Information

Please call or visit our Construction department for Deck Requirements.