Warren Weather
45°
drizzle
humidity: 100%
wind: 3mph ENE
H 45 • L 44
54°
Wed
48°
Thu
38°
Fri
43°
Sat
52°
Sun
Weather from OpenWeatherMap

What is the soil movement process through the Engineering Department?

What is the soil movement process through the Engineering Department?

Warren Township has determined that the uncontrolled and unregulated disturbance, excavation, filling and removal of soil has resulted and will result in conditions detrimental to the safety, health and general welfare of the public.  As such, compliance with section 15-9.2 of the Warren Township Ordinance may be required for work performed on residential properties. To determine applicability, the concerned party shall consult section 15-9.2 and questions directed to one of the employees in the Engineering Department. Generally, a permit application (which is available online) along with a plan to address section 15-9.2 shall be submitted along the requisite fees to the Engineering Department. The application and plan will be reviewed and once approved, a letter written approving the application.  (This approval is considered a prior approval for the construction department).  SOIL MOVEMENT/CONSTRUCTION DEBRIS APPLICATION

2016-04-19T15:46:56+00:00